Crushing Plant and B-Double Truck Loading Upgrade

CDMS Electrical Engineers were approached to upgrade the existing Automatic Truck Loading Facility at its Werris Creek Coal Plant from a single truck configuration to a B-Double configuration. CDMS Electrical provided a complete electrical package from the power, control and automation system concept design right through to final commissioning. For further details on the Power and Control System Design services provided by CDMS Electrical on this project please contact the CDMS Electrical Team on +61 (08) 9421 9060.